STEMCO Moisture Ejector installation covers mounting the valve at the wet or primary reservoir drain port and connecting the actuating port to the compressor governor unloader port or brake actuating line. The instructions explain automatic operation during compressor cut-in and cut-out, show typical automotive and stationary mounting layouts, and include important notes for maintaining the supplied threaded nipple, actuator orifice, heated unit wiring, and preventive maintenance cleaning.
Key Points
- Specifies installation at the wet or primary reservoir drain port using the supplied special 1/4″ N.P.T. nipple.
- Identifies 1/4″ O.D. tubing as the recommended actuator line from the ejector to the governor unloader port.
- Explains that tank pressure powers ejection and that the valve can eject liquid material and foreign matter from the air system.
- Warns not to remove the supplied threaded nipple or change the actuating-end orifice diameter.
- Includes heated unit wiring notes and preventive maintenance cleaning guidance.